Ecofrost

In Péronne (80), France, Pragma Construct built a 90-metre-long settling basin with concrete walls 5 m high and 40 cm thick. The project faced two major challenges: a very tight schedule, which called for precise planning and meticulously organised works, and a confined site footprint, where every delivery and every crew intervention had to be perfectly synchronised.

Ecofrost, Péronne (80)